Reorder point
Know when to reorder, with a buffer for uncertainty.
InventoryEstimate Kanban cards from daily demand, replenishment lead time, an entered safety allowance, and units per container.
Estimate Kanban cards from daily demand, replenishment lead time, an entered safety allowance, and units per container.
One card per container. An entered buffer is not a statistical service-level guarantee.
One card authorizes one container in this simplified pull loop. The safety allowance is a percentage of expected demand during replenishment, not a statistical service level. After rounding up, the tool shows authorized inventory and the extra units introduced by whole-container sizing. Use demand and replenishment lead time on the same day basis.
Kanban sizing relates consumption over the replenishment loop to a container quantity and an entered buffer. Use the complete loop, including waiting and movement, not just the production step.
A rounded number of cards does not guarantee material availability under unstable demand or an interrupted process. Confirm usable container quantity and replenishment discipline. Duplicated cards or stock outside the loop can obscure whether the intended policy is operating.
This sizes one assumed loop, not a full production Kanban design. Validate replenishment reliability, minimum card requirements, handling, container quantities, and actual production constraints before use.
Oracle overview of Kanban planningNo. It is an entered buffer on lead-time demand. Statistical safety stock and a validated service probability require a separate model.
A partial card or container would authorize less than the calculated requirement. Whole-container rounding can therefore add inventory beyond the entered buffer.