Reorder point
Know when to reorder, with a buffer for uncertainty.
InventoryEstimate lot-level consumption before expiry or an earlier dispatch cutoff, sharing each SKU demand stream once across its FEFO stock lots.
Estimate lot-level consumption before expiry or an earlier dispatch cutoff, sharing each SKU demand stream once across its FEFO stock lots.
All stock is assumed available on the as-of date. Demand is shared once across lots of each SKU. The cutoff date itself is excluded; expiry minus buffer defines that cutoff. Equal-expiry lots retain CSV order. Fractional expected units are not dispatch instructions.
| Lot | SKU | Expiry date | Dispatch cutoff | Quantity | Daily SKU demand | Usable days | Expected consumed | At-risk units | Stock value | At-risk value | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|
| LOT-C | SKU-B | 2026-10-15 | 2026-10-15 | 10 | 5 | 0 | 0 | 10 | 50 | 50 | Expired |
| LOT-A | SKU-A | 2026-10-20 | 2026-10-20 | 100 | 20 | 3 | 60 | 40 | 1,000 | 400 | At risk |
| LOT-B | SKU-A | 2026-10-27 | 2026-10-27 | 200 | 20 | 10 | 140 | 60 | 2,000 | 600 | At risk |
| LOT-D | SKU-C | 2026-11-16 | 2026-11-16 | 30 | 2 | 30 | 30 | 0 | 120 | 0 | Covered |
All entered lots are assumed available now. Lots are processed earliest-expiry-first, using one constant daily demand per SKU rather than multiplying demand for every lot. Demand must match across all rows of a SKU. The cutoff date itself is excluded: a lot expiring tomorrow with zero buffer has one usable day today. Earlier expired or blocked lots do not consume demand capacity. Equal-expiry lots retain CSV order.
Plan lot consumption against one shared SKU demand stream so the same future demand is not used to justify every lot independently. An earlier dispatch buffer can expose stock that expires before it can be supplied.
A FEFO simulation does not guarantee future demand or establish a product release decision. Check quality holds, customer minimum remaining shelf life, and receipt certainty. Potential unused quantity is a review indicator, not permission to ship restricted stock or write off inventory.
This is a deterministic inventory scenario, not a quality release, safety assessment, expiry extension, or dispatch instruction. Confirm manufacturer dates, storage conditions, minimum customer shelf life, and local definitions. It excludes replenishment, uncertain demand, backlog, and quality holds. Keep units consistent within each SKU; fractional expected consumption is permitted.
Microsoft shelf-life planning and FEFO referenceNo. Demand is shared across the SKU, so two lots cannot both claim the same future demand.
This model conservatively excludes the expiry date itself, or the earlier buffer cutoff. Apply your confirmed product and contractual definitions separately.